0 0
Read Time:19 Second

G R Infraprojects Limited has informed the Exchange about Issue of Provisional Completion Certificate for Construction of Four Laning of NH-71 from Madanapalli (Design Km 0.000/Existing Km 0.000) to Pileru (Design Km 55.900/Existing Km 59.250) (Design Length = 55.900 Km) Package-I on HAM Mode in the State of Andhra Pradesh under Bharatmala Pariyojna. |SUBJECT: General Updates

Happy
0 0 %
Sad
0 0 %
Excited
0 0 %
Sleepy
0 0 %
Angry
0 0 %
Surprise
0 0 %
Mb Buch

Average Rating

5 Star
0%
4 Star
0%
3 Star
0%
2 Star
0%
1 Star
0%

Leave a Reply

Your email address will not be published. Required fields are marked *